
As you can see, different RAM chips than I am used to, a blank space for a blitter (Am thinking this is a late STFM board before the STE) and where the MMU will go seems to be pointing in a different direction. Also 2 TOS chips, currently 1.02 but have purchased the 1.04 too.
RAM isolation..... I have cut the pins on the gold side of the resistors (R59 - R61) joined them together and ran a wire to the + of the large capacitor as you can see below...

I have popped a bit of hot glue in place, mainly to stop anything connecting when it shouldn't, I will remove the rest of the RAM and Capacitors on the left hand side of the top photo once a test has been done.
Onto the MMU....I mentioned it was round the other way compared to the instructions so will have to mount it shown below...

I will also remove the sockets for the shifter before installing, also note I have already joined cables to select a switch from 1MB to 4 MB. I have been testing the connections as they go and the machine was fully working before taking apart so fingers crossed the rest of the install should go to plan

So at this stage I suppose its a very quick question to the forum, am I doing everything right?